20,600 SF 4 story multi-tenant office building. Ballasted roof
system at the end of service life
Tenants: World Trade Center Club, Caf Opla, Columbia
Hospitality, World Affairs Council and Others


4

Approach
A Sustainable Evaluation
Framework will be used
Balance Cost with Increased
Energy Efficiency
Installation of a Green Roof
Technology
Overlay existing waterproof
membrane, add insulation, and
reuse the existing Gravel Ballast

5

WTCW Roof Photos of Existing Gravel Ballast and Membrane
6

Evaluate Green Roof Design



WTCW Roof Top Schematic of Gravel Ballast with a Partial Green Roof Technology
7

Contracting Method and Schedule
December 2021: Design Authorization
December 2021 ~ Q2/2022: Design
Q2/2022: Construction Authorization
Q3 2022 : Advertise, Award, and Execute Construction Contract
Q3 2022 : Construction
Q1/2023: In-use date


8

Questions?



9

Limitations of Translatable Documents

PDF files are created with text and images are placed at an exact position on a page of a fixed size.
Web pages are fluid in nature, and the exact positioning of PDF text creates presentation problems.
PDFs that are full page graphics, or scanned pages are generally unable to be made accessible, In these cases, viewing whatever plain text could be extracted is the only alternative.