8d. Presentation
Load Dock Employee Screening Project at SEA International Airport
Item No. 8d_supp Meeting Date: June 28, 2022 Load Dock Employee Screening June 28, 2022 Port Commission Meeting Seattle-Tacoma International Airport Project Purpose • This project is required in order to meet the Airport’s goal of full employee screening. This will help ensure safe and secure operations by ensuring prohibited items are not brought into the sterile area. • Currently, there is access control to the secure side of the terminal on the load dock, but no employee screening. • Employee screening on the load dock would be collocated with inspections for deliveries in order to provide screening for employees, vendors, contractors, and their personal items. 2 3 Until Do Not Depart GateIsSecured hI)are re LE LL orized entry any unauth 4 Proposed Screening Layout 5 Rohde & Schwarz Quick Personnel Security Scanner 6 Rapiscan 927DX X-Ray Machine 7 Project Milestones 8 Project Estimate Cost Breakdown This Request Total Project Design $398,000 $453,000 Construction $726,000 $726,000 Owner Furnished Equipment $521,000 $521,000 To ta l $1,645,000 $1,700,000 9 Thank you 10
Limitations of Translatable Documents
PDF files are created with text and images are placed at an exact position on a page of a fixed size.
Web pages are fluid in nature, and the exact positioning of PDF text creates presentation problems.
PDFs that are full page graphics, or scanned pages are generally unable to be made accessible, In these cases, viewing whatever plain text could be extracted is the only alternative.