10b. Presentation
South 160th St TNC Lot Improvements
Item No. 10b_supp Date of Meeting February 14, 2023 South 160th Street Lot TNC Improvements Construction Authorization Project Purpose Purpose: To minimize operational maintenance costs and encourage sustainable ground transportation services with installation of permanent lighting system and EV chargers. Scope: • Replacement of existing diesel-powered temporary light plants with lighting systems • Installation of 10 EV chargers with associated infrastructure upgrades • Installation of 4 permanent restrooms for TNC operators • Installation of security cameras for operational awareness • Landscaping and irrigation improvements 2 Project Location N S 146th St Rental Car Facility th 24 Ave S S 160th St S 160th St GT Holding Lot 3 Existing Conditions Diesel-powered TNC side of S 160th St Temporary Restroom temporary light plant GT holding lot Facilities 4 Project Budget & Schedule Project Budget: $7,300,000 Key Schedule Milestones: Department of Commerce Grant • Advertise for Construction: Q1 2023 • Reimbursement of up to $1,229,322 • Construction Start: Q2 2023 – Port of Seattle: $757,262 • Estimated In-Use Date: Q1 2024 – 3rd Party (EVGo): $472,060 Transformer Electrical Equipment EV Chargers 5
Limitations of Translatable Documents
PDF files are created with text and images are placed at an exact position on a page of a fixed size.
Web pages are fluid in nature, and the exact positioning of PDF text creates presentation problems.
PDFs that are full page graphics, or scanned pages are generally unable to be made accessible, In these cases, viewing whatever plain text could be extracted is the only alternative.