8e. Presentation
Utility Meter Networking Design Authorization
Item No. 8e_supp Meeting Date: September 12, 2023 Utility Meter Networking Abhinav Prasad Project Manager, AV-PMG Project Scope • Replacement of outdated electrical meters with new standard electrical meters (approximately 800 meters) • All meters will be networked into existing Port infrastructure. • Meters are being replaced to meet current code requirements (Washington State Energy Code, Clean Building Performance Standard, and IEEE 1547). Meter Locations 2 Meter Comparison Existing Meters New Meters • Network integration not possible • All meters on centralized database • Spare parts not readily available • Network integration possible • Warranty expired • Data easier to access resulting in cost reductions for projects • Spare parts easily available 3 Preliminary Schedule Milestone Date Commission Design Authorization Q3 - 2023 Design Start Q3 - 2024 Design Complete Q1 - 2026 Commission Authorization for Construction Q1 - 2026 Construction Award Q2 - 2026 Substantial Completion Q1 - 2028 4 Budget COST ESTIMATE Capital ERL To ta l Current Estimate $35,525,000 NA $35,525,000 5 Cone of Certainty W e are here QUESTIONS? 7
Limitations of Translatable Documents
PDF files are created with text and images are placed at an exact position on a page of a fixed size.
Web pages are fluid in nature, and the exact positioning of PDF text creates presentation problems.
PDFs that are full page graphics, or scanned pages are generally unable to be made accessible, In these cases, viewing whatever plain text could be extracted is the only alternative.