Closed Captions (Click here to move, bottom corner to resize, turn off CC to hide)

August 9th, 2022 - Regular Meeting

Pier 69
Preferred Document Format: 
(Accessible for ADA and Translation)
Video keyboard shortcuts. Space for Pause/Play, Up or Down for Volume, Left or Right for forward or backward
Video Player is loading...
loading...
Documents
Video Clips
Share
ADA/Language
Attachments|
  • 7. Attachment
    Exhibit A
  • 8b. Memo
    Claims and Obligations July 2022
  • 8c. Memo
    Departures Drive Drainage Project
  • 8c. Presentation
    Departures Drive Drainage Project
  • 8d. Memo
    Snow Removal Contracts
  • 8e. Memo
    Chiller 6 Repairs
  • 8e. Presentation
    Chiller 6 Repairs
  • 8f. Memo
    Access Control Doors
  • 8g. Memo
    Network Technical Services Contract Authorization
  • 8h. Memo
    Airport North Employee Parking Lot Security Contract
  • 8h. Presentation
    Airport North Employee Parking Lot Security Contract
  • 8i. Memo
    Collective Bargaining Agreement for Cement Masons
  • 8i. Attachment
    Collective Bargaining Agreement for Cement Masons
  • 8j. Memo
    Approval of Commission International Travel
  • 10a. Memo
    Maritime Blue Contract Renewal
  • 10a. Presentation
    Maritime Blue Contract Renewal
  • 10b. Memo
    Sound Insulation Program Briefing
  • 10b. Presentation
    Sound Insulation Program Briefing
  • 10c. Memo
    Apartment Sound Insulation Program

This feature is currently being reviewed for accuracy. If the video clips times are not as expected, please let us know.

To download portions of the recorded video of this meeting, specify the Agenda items, and up to 5 custom start/stop times. You will receive an email with download links that are valid for 3 days.
Agenda Item Clips
Custom Clips  (Clips must be at least 15 seconds, and cannot exceed 15 minutes.)
Each clip must be individually extracted, saved and packaged for you.
Share the entirety of this meeting.
Share a portion of this meeting (Using optional video start and start times.)
Apply Reset
 Copy