Closed Captions (Click here to move, bottom corner to resize, turn off CC to hide)
September 9th, 2025 - Regular Meeting
Pier 69
Preferred Document Format:
(Accessible for ADA and Translation)
Video keyboard shortcuts. Space for Pause/Play, Up or Down for Volume, Left or Right for forward or backward
Video Player is loading...

Documents
Video Clips
Share
ADA/Language
- Documents
- Agenda
- Transcript
- Download Packet
- Play/Download Audio Only
- 4a. Proclamation
Latino Heritage Month 2025 - 8b. Memo
August 2025 ED Monthly Delegation Notice - 8c. Order
Reappointing Board of Ethics Member - 8d. Memo
Commission International Travel Fourth Quarter 2025 - 8e. Memo
Washington Protected Sick Leave - 8e. Attachment
Washington Protected Sick Leave - 8f. Order
South King County Community Impact Fund Renaming - 8g. Attachment
Fleet Telematics and Cameras - 8g. Memo
Fleet Telematics and Cameras - 8h. Attachment
East Waterway Remedial Design Order and MOA 02 - 8h. Attachment
East Waterway Remedial Design Order and MOA 01 - 8h. Presentation
East Waterway Remedial Design Order and MOA 01 - 8h. Memo
East Waterway Remedial Design Order and MOA - 8i. Memo
Fishermens Terminal Downie Building Demolition and Paving - 8i. Presentation
Fishermens Terminal Downie Building Demolition and Paving - 8j. Memo
MARAD PIDP Grant Competition Waiver - 10a. Memo
Utility Meter Networking - 10a. Presentation
Utility Meter Networking - 10b. Presentation
Amending the Welcoming Port Policy Directive Reso 3838 - 10b. Memo
Amending the Welcoming Port Policy Directive Reso 3838 - 10b. Resolution
Amending the Welcoming Port Policy Directive Reso 3838 - 10c. Memo
2025 Maritime Workforce Investments - 10c. Presentation
2025 Maritime Workforce Investments - 11a. Memo
Cyberattack Response Briefing - 11a. Presentation
Cyberattack Response Briefing
This feature is currently being reviewed for accuracy. If the video clips times are not as expected, please let us know.
To download portions of the recorded video of this meeting, specify the Agenda items, and up to 5 custom start/stop times. You will receive an email with download links that are valid for 3 days.